by Quinn Brislin | Dec 8, 2021 | Residential
Underground rough-ins.
by Quinn Brislin | Aug 2, 2018 | Commercial
Summer of 2018 – MSU Chilled Water Loop Upgrade project included horizontal drilling of two 24″ HDPE pipes from Herbert Hall to McCarthy Hall below the ‘Drill Field.’ Over 3,600′ of piping was installed with almost zero impact to...
by Quinn Brislin | Feb 29, 2016 | Commercial
EMCC Student Union to open August 2016 at the Mayhew, MS campus. Work includes site utilities, plumbing, and 150 ton, ground loop geothermal HVAC system....