Summer of 2018 – MSU Chilled Water Loop Upgrade project included horizontal drilling of two 24″ HDPE pipes from Herbert Hall to McCarthy Hall below the ‘Drill Field.’ Over 3,600′ of piping was installed with almost zero impact to Campus.